Posted on Tuesday, May 25, 2004 - 11:02 am:   

Can someone please clarify what is being done about the traffic problem at the El Dorado/DNT intersection?

During morning rush hour the backup of cars starting around 6:45 can extend almost to the middle school, which is over a mile. There are about 15-20 cars that go south for every car that goes any other direction. The problem compounds when a semi is at the intersection trying to make a turn.

This problem also occurs in the evenings with traffic backing up northbound on the DNT. On average it backs up over a mile but at times can run almost to Main St.

I have read that a traffic study was performed that did not warrant a traffic light being installed. How can this be?
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 184
Registered: 07-2001
Posted on Tuesday, May 25, 2004 - 01:29 pm:   

Ben,

A traffic signal has been warranted for this location. The design is complete and the project has been bid. We expect the construction to be complete by August.

Thanks
Brian Moen
bmoen@friscotexas.gov
 

Reddog
New member
Username: Reddog

Post Number: 3
Registered: 07-2003
Posted on Tuesday, August 03, 2004 - 09:10 am:   

Can we please get an update on the "complete by August" timeframe for the stoplight at Eldorado and Dallas Parkway? Additionally, it is becoming extremely dangerous trying to turn onto Eldorado from the subdivisions between the Dallas Parkway and 423. Any plans on adding a stop light at Teel to help rectify this situation?
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 190
Registered: 07-2001
Posted on Tuesday, August 03, 2004 - 06:34 pm:   

Reddog,

Our latest word with the signal contractor working on Dallas Parkway and Eldorado is that the signal could begin flashing operations by the end of this week provided everything goes according to plan. The signal would then be put into full operations by the middle of next week. Based on the contract, the signal contractor has until August 23 to have the signal operating.

At Teel and Eldorado, we are working with TxDOT on having a signal authorized for this location. Our most recent study at that location shows that a signal is warranted. Based on that study, we had a traffic signal design contract approved by Council on July 6 that allows us to begin designing the signal. We are currently working to get funding for the construction of the signal once the design is complete.

Thanks
Brian Moen
Transportation Manager
 

kat graham
New member
Username: Graham

Post Number: 1
Registered: 04-2004
Posted on Wednesday, August 25, 2004 - 10:55 am:   

What is the status of the light for Teel and Eldorado?
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 195
Registered: 07-2001
Posted on Wednesday, August 25, 2004 - 01:33 pm:   

Kat,

A signal warrant study for this location has been completed and sent to TxDOT. TxDOT is currently reviewing the study. Once their review is complete, they will then make a decision on whether or not to authorize a signal for Teel and Eldorado. I fully expect them to authorize the signal. We are currently discussing funding options and possible construction dates.

As an interim measure until a signal is installed, we have asked them to consider installing an all-way stop. I don't expect to have an answer regarding this possibility for another 6 weeks or so.

Thanks
Brian Moen
Transportation Manager
 

Cristopher D. Marshall
New member
Username: Utdogs1997

Post Number: 8
Registered: 01-2004
Posted on Saturday, October 02, 2004 - 11:41 pm:   

Any update from TX DOT regarding the stop light reveiw for El Dorado & Teel?

Or any word from them regarding the all-way stop at the same intersection?

Signed,
Hopeful
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 201
Registered: 07-2001
Posted on Tuesday, October 05, 2004 - 10:10 am:   

Christopher,

A traffic signal has been authorized by TxDOT for this intersection. The all-way stop was not approved at this time. Once the signal at FM 423 and Eldorado is functioning, we will study the location again to see how the signal impacts traffic flow along Eldorado. An upstream traffic signal tends to create larger gaps in traffic that can be used by side street traffic.

We are working on the design of the signal at this time. I expect to have the design complete by the end of December. Then it will be up to TxDOT to construct. When meeting with TxDOT last week, they were not able to give us a definitive timeline for construction. At this time, I would expect to have the signal in place by spring/summer of 2005.

Thanks
Brian Moen
Transportation Manager
 

Shafi Haque
New member
Username: Shafi_haque

Post Number: 31
Registered: 01-2003
Posted on Tuesday, October 05, 2004 - 10:41 am:   

Hello!
What is the schedule start date for FM 423 and Eldorado Traffic signal? I think this is TxDOT project.

Thanks
Shafi
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 203
Registered: 07-2001
Posted on Tuesday, October 05, 2004 - 01:30 pm:   

Shafi,

The signal should be placed into full operation by October 25.

Thanks
Brian Moen
Transportation Manager
 

Scott Stedman
New member
Username: Texas76

Post Number: 5
Registered: 06-2004
Posted on Friday, October 29, 2004 - 09:33 am:   

Has the timing been changed on this light recently? For evening rush hour traffic headed north or turning west on to El Dorado the back up used to only be several cars long. Now the backup typically extends past the contruction entrance to the high school. That is worse than it was before the light was installed.
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 206
Registered: 07-2001
Posted on Monday, November 01, 2004 - 08:10 pm:   

Scott,

We will observe the location this week. There have not been any timing changes.

Thanks
Brian Moen
Transportation Manager
 

Scott Stedman
New member
Username: Texas76

Post Number: 6
Registered: 06-2004
Posted on Thursday, November 11, 2004 - 07:39 am:   

Any news on this topic since the location was observed? The back-up seems to be getting worse. Maybe there are just that many more vehicles using the DNT north to avoid the Main street construction.
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 209
Registered: 07-2001
Posted on Thursday, November 11, 2004 - 04:30 pm:   

Scott,

We will be out there this evening making changes to try and improve the situation.

Thanks
Brian Moen
Transportation Manager
 

Ryan Lambert
New member
Username: Rlambe

Post Number: 2
Registered: 11-2004
Posted on Thursday, January 20, 2005 - 08:07 am:   

Can you give a status update on the light and Teel and Eldorado?
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 227
Registered: 07-2001
Posted on Thursday, January 20, 2005 - 06:40 pm:   

Ryan,

I am waiting for some date information from TxDOT for the construction and completion. Plans were completed and approved by TxDOT before the holidays. The plans have been sent to the their construction office and their on-call signal contractor.

Thanks
Brian Moen
Transportation Manager
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 230
Registered: 07-2001
Posted on Tuesday, January 25, 2005 - 03:55 pm:   

Ryan,

I spoke with TxDOT earlier today. Their on-call signal contractor will be receiving a notice to begin work on the signals tomorrow. Once that notice is issued, the contrator must begin work within 7 days. The contractor will have 30 days to complete the work. Based on that, I would expect the signal to be completed and operational in early March.

Thanks
Brian Moen
Transportation Manager
 

Anonymous
New member
Username: None

Post Number: 25
Registered: 11-2003
Posted on Thursday, February 17, 2005 - 07:41 am:   

Brian,

I have not noticed that any work has begun on this light. Can you get an update for us?
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 234
Registered: 07-2001
Posted on Friday, February 18, 2005 - 04:51 pm:   

I will contact TxDOT next week to check on the status.

Brian
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 235
Registered: 07-2001
Posted on Wednesday, February 23, 2005 - 04:16 pm:   

We met with TxDOT and the signal contractor at the intersection yesterday to locate where all of the new poles and other equipment should be installed. They should begin working within the next 7 to 10 days depending on the weather. This location is one of among five intersections that TxDOT is constructing under this contract. Initially this location was to be done first; however, the signal for the FM 423 and FM 720 intersection was moved ahead of Teel and FM 2934 intersection. That is the reason for the delay from my original post.

I expect the signal to be complete by early April or before.

Thanks
Brian Moen
Transportation Manager
 

Maristella Aguilo
New member
Username: Maguilo

Post Number: 2
Registered: 02-2005
Posted on Thursday, March 17, 2005 - 02:20 pm:   

The latest information I've found here for the status on the signal light between El Dorado and Teel dates back to August, 2004. I think I've asked this before and I was shown some posted answers indicating that such light would be operational by March, 2005 or so, but I see no indications of any signal light being built there. Could you please provide us with an update? Thanks!
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 242
Registered: 07-2001
Posted on Friday, March 18, 2005 - 12:42 pm:   

Maristella,

The traffic signal at Teel and Eldorado is under construction. The wooden poles are in place, portions of the spanwire are done, and the electrical service is complete. The contractor picked up some equipment from our shop yesterday and they will be installing the controller cabinet and video cameras shortly.

Based on the contractor’s progress to date, I expect that the signal will be complete by early April or before.


Thanks
Brian Moen
Transportation Manager

Add Your Message Here
Post:
Username: Posting Information:
This is a private posting area. Only registered users and moderators may post messages here.
Password:
Options: Post as "Anonymous"
Enable HTML code in message
Automatically activate URLs in message
Action: