Dam Hoang
New member
Username: Damhoang

Post Number: 1
Registered: 01-2005
Posted on Wednesday, January 26, 2005 - 02:51 pm:   

Can someone please provide some information on when the construction for DNT Phase 3 or DNT south bound service road from main st. North will be starting.
 

Brian Moen, Transportation Manager
Moderator
Username: Brian

Post Number: 232
Registered: 07-2001
Posted on Monday, January 31, 2005 - 09:02 am:   

Dam,

Zachry construction has been given notice to proceed on construction of the DNT from John Hickman (midway between Warren and Lebanon) to just north of Eldorado. They will be building the main lanes in this section as well as the southbound service road from Eldorado to Main. The southbound service road from Eldorado to Main is scheduled to be open by August 2006.

Last week, NTTA opened bids for the section from Gaylord to John Hickman. I would anticipate that the contractor for this section will receive notice to proceed probably within the next 60 days.

The plans are being finalized for DNT from Eldorado to US 380. These plans include the southbound frontage road as well as the main lanes. Construction on this section should start by this summer. I do not have any date information from NTTA when the new southbound service road being built with this last phase will be completed.

NTTA is telling us that the entire DNT and service roads through Frisco should be complete by September 2007. It is unknown at this time if the DNT will open up in sections or all at once in September 2007.

Thanks
Brian Moen
Transportation Manager
 

Randall Harris
New member
Username: Raharris

Post Number: 1
Registered: 02-2005
Posted on Thursday, February 24, 2005 - 09:30 pm:   

I've heard that the DNT will be built below ground level through at least part of this phase. Is this something that can be confirmed? I am purchasing a house in the area and would be most interested to know. Thanks!

(Message edited by admin on February 28, 2005)
 

Frank Jaromin, City Engineer
Moderator
Username: Frank_jaromin

Post Number: 138
Registered: 07-2003
Posted on Monday, February 28, 2005 - 01:21 pm:   

The current plan is underpasses at Warren, Lebanon and Stonebrook for the Toll Road. If you would like to see a specific area on the Toll Road you are welcome to come by and review the drawings

If you require further information please call me at 972-335-5585 ext. 129.

Frank Jaromin
City Engineer
 

Kimberly Dalton, EIT
New member
Username: Kimberly_dalton

Post Number: 22
Registered: 06-2003
Posted on Monday, February 28, 2005 - 11:30 am:   

The main lanes of the DNT will be depressed at Lebanon, Warren, and Stonebrook. The frontage roads will remain at ground level. Citizens are welcome to come by our offices at 6990 Main Street to review the plans if you are interested in a particular area.

Sincerely,

Kimberly Dalton
kdalton@friscotexas.gov
 

Doug
New member
Username: Doug

Post Number: 28
Registered: 08-2003
Posted on Friday, March 11, 2005 - 10:03 am:   

Will the tollway go over or under the railroad tracks?
 

Frank Jaromin, City Engineer
Moderator
Username: Frank_jaromin

Post Number: 145
Registered: 07-2003
Posted on Monday, March 14, 2005 - 12:34 pm:   

The Main Lanes of the Toll Road will be above grade or over the Tracks.

Add Your Message Here
Post:
Username: Posting Information:
This is a private posting area. Only registered users and moderators may post messages here.
Password:
Options: Post as "Anonymous"
Enable HTML code in message
Automatically activate URLs in message
Action: