hot hippie chick
New member
Username: Hothippiechick

Post Number: 3
Registered: 06-2004
Posted on Thursday, October 07, 2004 - 01:07 pm:   

Can you tell me anything about the construciton site at the NE corner of Main & Teel? It seems the formwork has been up for over a month and nothing is happening. This intersection is very vital to the neighborhood and to see a project languishing when the adjacent businesses and contractors are doing well is distracting.
 

Scott Ingalls, Zoning & Subdivision Admi
Moderator
Username: Scott_ingalls

Post Number: 99
Registered: 06-2003
Posted on Friday, October 08, 2004 - 03:18 pm:   

The site that you are referring to was originally to be an Eckerd's Pharmacy. However, after construction began Eckerds was purchased by CVS Pharmacies. The organization is currently undergoing a reorganization. For this reason construction was stopped on the site. We do not know when or if they will start construction again.

Please feel free to contact me at 972.335.5540, Ext. 142 or email me if you should have any questions. Thank you.

Scott Ingalls
Zoning & Subdivision Administrator
 

hot hippie chick
New member
Username: Hothippiechick

Post Number: 4
Registered: 06-2004
Posted on Monday, October 11, 2004 - 10:34 am:   

How long will the City of Frisco let an incomplete construction project 'sit' before it's found to be an eyesore on the community? Not that this one is anywhere near that point, but just curious.
 

TIM Heitman
New member
Username: Fairwayman

Post Number: 6
Registered: 11-2003
Posted on Monday, October 11, 2004 - 10:37 am:   

Does this situation delay the construction of Teel north of Main? I have noticed that there has been no activity for several weeks.
 

Scott Ingalls, Zoning & Subdivision Admi
Moderator
Username: Scott_ingalls

Post Number: 101
Registered: 06-2003
Posted on Monday, October 11, 2004 - 02:05 pm:   

The Building Permit for that site has been closed due to abandonment of the project. Any further construction will require a new permit. Our Code Enforcement officers will keep an eye on the site and watch for any conditions that could constitute a safety hazard.

Please feel free to contact me at 972.335.5540, ext. 142 if you should have any further questions. Thank you.

Scott Ingalls
Zoning & Subdivision Administrator
 

Scott Ingalls, Zoning & Subdivision Admi
Moderator
Username: Scott_ingalls

Post Number: 102
Registered: 06-2003
Posted on Monday, October 11, 2004 - 02:15 pm:   

Tim,

The City of Frisco is building Teel Parkway and has an agreement with the Henry S. Miller Company whereby they will donate right-of-way for Teel. The abandonment of the Eckerd project should not impact upon the construction of Teel Parkway.

Please feel free to contact me at 972.335.5540, Ext. 142 if you should have any further questions. Thank you.

Scott Ingalls
Zoning & Subdivision Administrator
 

Stuart Snook
New member
Username: Dchi72

Post Number: 4
Registered: 10-2003
Posted on Monday, October 11, 2004 - 11:03 pm:   

Is the city following up with CVS pharmacy concerning the building on Eldorado and 423? According to the last mews reports, CVS does not plan on pursuing this location.
 

Scott Ingalls, Zoning & Subdivision Admi
Moderator
Username: Scott_ingalls

Post Number: 103
Registered: 06-2003
Posted on Tuesday, October 12, 2004 - 09:14 am:   

Stuart,

Use of the building by CVS or the sale or lease of the building is the decision of CVS Pharmacies. The City will work with CVS to find a use or occupant for the building but only in an advisory role. We have no authority to require that the building be occupied within a certain period of time.

If information becomes available as to the use of the building and property we will post a message on this message board. Please feel free to contact me at 972.335.5540, Ext. 142 if you should have any further questions. Thank you.

Scott Ingalls
Zoning & Subdivision Administator
 

Frank Jaromin, City Engineer
Moderator
Username: Frank_jaromin

Post Number: 110
Registered: 07-2003
Posted on Thursday, October 14, 2004 - 11:37 am:   

The project was held up do to utility conflicts, Site has been release to back to work. This project will be completed with or without the development on the corner.

If you would like to discuss this further please contact me at 972-335-5580 ext 156
Frank Jaromin
City Engineer
 

Wayne Tullos
New member
Username: Wayne_tullos

Post Number: 2
Registered: 09-2004
Posted on Thursday, November 04, 2004 - 12:16 am:   

I pass by the road construction project everyday. I have not seen any crews there for weeks. The last post in this column was on Thursday, Oct. 14th, and it states that the project was to resume. It's now over two weeks later, and there is nothing going on! Please explain why there is still a delay. We need this intersection very badly, as the traffic on Southbound Teel at Main in the mornings is terrible.
 

Amy Gill, Assistant to the City Manager
Moderator
Username: Amyg

Post Number: 84
Registered: 08-2002
Posted on Friday, November 05, 2004 - 05:45 pm:   

We know you are anxious to have the road opened, and we are anxious to help the traffic flow issues in that area. It is has been our goal to have this road open to the public right after the new year, and we intend on meeting it.

As you know, Teel Parkway was hamstrung by several unforeseen utility conflicts. There actually are still 2 conflicts, fortunately, they do not affect the critical path. The contractor has been onsite as weather has allowed working on storm sewer lateral, water line stubs, and sanitary sewer stubs.

Usually these public utility extensions are simple and quick. However, southbound Teel was not constructed to facilitate easy expansion. Typically, we stub public utilities beyond the pavement so they can be extended easily in the future. Unfortunately, almost all of the stubs on this project were stubbed short. The contractor has spent significant time finding these utilities. Regardless, almost all utility issues have now been resolved, although some work will have to be done AFTER the new lanes are complete.

We expect to do standard subgrade tests early next week and begin subgrade preparation late next week. This phase takes about 2 weeks. Given Thanksgiving, I expect concrete to be poured by early in December.


Wesley Wright, E.I.T.
City of Frisco Engineering Services
6859 Main Street
Frisco, TX 75034
Phone: 972-731-4941 Ext. 122

 

pmcbe
New member
Username: Pmcbe

Post Number: 1
Registered: 11-2004
Posted on Friday, November 05, 2004 - 09:10 am:   

I was wondering about the new shopping center signs that have gone up on the SE corner of the toll and eldorado. can you tell me what is set to be a part of that.
 

Scott Ingalls, Zoning & Subdivision Admi
Moderator
Username: Scott_ingalls

Post Number: 107
Registered: 06-2003
Posted on Monday, November 08, 2004 - 11:17 am:   

pmcbe,

This corner was part of a larger planned development and called for the site to be developed as a retail stripcenter. We have not received any applications yet for platting or site plans for the property. It is not uncommon for a developer to put up leasing signs to prelease retail space before coming in with a site plan. We typically do not know what stores are coming into a center at the time of site plan review and approval. Only later when actual building permit applications are made will the store occupant be known. Thank you.

Scott Ingalls
Zoning & Subdivision Administrator
 

TIM Heitman
New member
Username: Fairwayman

Post Number: 7
Registered: 11-2003
Posted on Friday, December 10, 2004 - 09:58 am:   

According to a post by Amy Gill on November 5th the City was to begin pouring concrete in "early December" at Teel north of Main St. There has been no activity there since that post. Since the rebar isn't even laid I would not think that a concrete pour will be done in the time frame indicated. Can anyone give us an update on the project and what the latest delays are?

The road was to be completed sometime early next year. Is that time frame still reasonable?

Also, what is that status of the Teel bridge project north of the Trails Golf course. At a meeting with the Mayor it was indicated that this project was green lighted. Can you give a time frame for its construction and completion?

Finally, when will construction of Teel south of Main St. begin. Is this project still on schedule. I believe it was due to be completed by the middle of the summer?
 

Wesley Wright, E.I.T., Engineering Servi
Moderator
Username: Wesley_wright

Post Number: 1
Registered: 09-2003
Posted on Monday, December 13, 2004 - 01:45 pm:   

The contractor has had a difficult time making final grade on Teel with all the rain. Things are drying up nicely now. We see no reason the contractor cannot have the road paved before Christmas. I think we can expect to have the road opened by the end of January.

The Teel Bridge is under design now and should be complete this spring. After that, the project could go to construction as soon as funds are encumbered. Construction will take approximately 9 months.

Teel south of Main Street was just bid. We are taking care of administrative issues now. We expect construction to being in February and be completed in October.
 

Kristi Godfrey
New member
Username: Kgodfrey

Post Number: 3
Registered: 06-2004
Posted on Tuesday, December 21, 2004 - 09:10 pm:   

Can the residents on the North West side have an update on Teel?

(Message edited by amyg on December 28, 2004)
 

David Wilson
New member
Username: Dmwdaltx

Post Number: 1
Registered: 11-2004
Posted on Wednesday, December 22, 2004 - 05:44 am:   

An update please....doesn't look like this is going to get paved before Christmas.
 

Wesley Wright, E.I.T., Engineering Servi
Moderator
Username: Wesley_wright

Post Number: 2
Registered: 09-2003
Posted on Tuesday, December 28, 2004 - 03:31 pm:   

Teel was not able to be paved before Christmas. Some of the final soils tests were not adequate for paving.

Tests were taken again today. Assuming they come back good, I am going to push to have the contractor pave at least the portion south of the bridge this week.

If the weather holds out, I still feel that we could have the road opened by the end of January.
 

TIM Heitman
New member
Username: Fairwayman

Post Number: 10
Registered: 11-2003
Posted on Tuesday, January 18, 2005 - 01:07 pm:   

What is the status on construction of the bridge on Teel? Now that progess is being made on the road, the next step would be the bridge. The mayor and city manager stated during a recent town hall meeting that the process on designing and building the bridge was set in motion. This was about 3 months ago. Can someone update us on the process. I would not expect the bridge to be completed for at least 2 more years, but a timeline would be helpful.
 

Curt Balogh, Spec. Asst. to the City Mgr
Board Administrator
Username: Admin

Post Number: 102
Registered: 02-2003
Posted on Wednesday, January 19, 2005 - 09:31 am:   

Mr. Heitman,

Wes Wright posted this on December 13: "The Teel Bridge is under design now and (design)should be complete this spring. After that, the project could go to construction as soon as funds are encumbered. Construction will take approximately 9 months."

That timeline is still accurate. Funding for this bridge is on the list of priority road projects that staff will be presenting to City Council within the next 2 weeks. Given Wes' timeline, this bridge should be completed near the beginning of 2006.
 

Tim Heitman
New member
Username: Fairwayman

Post Number: 11
Registered: 11-2003
Posted on Wednesday, March 30, 2005 - 01:29 pm:   

Was the bridge funding approved by the City Council?
 

Frank Jaromin, City Engineer
Moderator
Username: Frank_jaromin

Post Number: 149
Registered: 07-2003
Posted on Monday, April 04, 2005 - 01:16 pm:   

City Council reviewed the Phase II projects at their last meeting in March but has not yet approved that list. The Teel Road Bridge is on the Phase II list of projects. Staff will take it back to council within the next month for their consideration.
If further informatin is required please advise.
Frank Jaromin
972-335-5585 ext 129

(Message edited by admin on April 05, 2005)
 

CP
New member
Username: Twfdownbrook

Post Number: 7
Registered: 09-2004
Posted on Monday, April 11, 2005 - 08:06 am:   

Any update on NE corner of Main & Teel? The original Eckerd site still has no movement.
 

Scott Ingalls, Zoning & Subdivision Admi
Moderator
Username: Scott_ingalls

Post Number: 143
Registered: 06-2003
Posted on Monday, April 11, 2005 - 08:39 am:   

CP,

There is no change on the status of the Eckerd/CVS Pharmacy site. The building permit has been closed as the project has been abandoned. Any future development of this site will require a new building permit. Thank you for your interest.

Scott Ingalls
Zoning & Subdivision Administrator
 

Jeff K
New member
Username: Jsk

Post Number: 2
Registered: 12-2004
Posted on Wednesday, April 20, 2005 - 08:57 pm:   

Can you give an update on the opening of all the lanes on Teel Parkway from The Trails to just south of Main street? Also, will trees be planted in the new median on Teel?
 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 25
Registered: 10-2003
Posted on Thursday, April 21, 2005 - 02:53 pm:   

Jeff,

The contractor has just finished opening all the southbound lanes on Teel Parkway from the Trails to just south of Main Street and is at this very moment removing the barrels to open all the lanes for the northbound traffic.

The section of Teel Parkway north of the bridge to Eldorado Parkway is scheduled to open by the end of next week.

As for trees, there is nothing in the contract for the road job to install trees. The Parks Department is responsible for the planting in the median and most likely have a plan to complete Teel in the near future now that the road is nearing completion. You can contact Bobby Johnson at (972) 335-5517 for further information on this subject.

If you have any further questions regarding the road project, please feel free to contact me at (972) 335-5585 ext. 127.

Thank you for your post and your patience, Hulon
 

Jeff K
New member
Username: Jsk

Post Number: 3
Registered: 12-2004
Posted on Thursday, April 21, 2005 - 03:26 pm:   

Can you give an update on the Main street construction from east of Dallas Pkwy through downtown Frisco? What is the scheduled completion date for this project?

Thanks in advance for your response.
 

Ryan Lambert
New member
Username: Rlambe

Post Number: 3
Registered: 11-2004
Posted on Friday, April 22, 2005 - 07:47 am:   

When will the street lights recently installed above Teel be turned on? It is very dark at night on this street. Thanks

(Message edited by admin on April 22, 2005)
 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 26
Registered: 10-2003
Posted on Friday, April 22, 2005 - 11:13 am:   

Jeff,

The following is the construction schedule for the two (2) Main Street projects:

Main Street, Phase 3 (DNT - BNSF Railroad): Anticipated to be complete in July 2005

Main Street, Phase 4 (BNSF Railroad - Preston Road): Anticipated to be complete in July 2006

Thanks, Hulon

 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 27
Registered: 10-2003
Posted on Friday, April 22, 2005 - 11:20 am:   

Ryan,

The lighting contractor has just recently finished standing the lights up on the entire job and still has to complete the installation of the breakaway bases and wiring of the entire circuit. They also have to coordinate the installation of the electrical service. The contractor expects to have their construction complete at the end of this month so that the utility company can place the electrical service early next month. So to answer your question, the lights will most likely be turned the middle of next month.

Thanks, Hulon
 

Tim Heitman
New member
Username: Fairwayman

Post Number: 12
Registered: 11-2003
Posted on Thursday, June 16, 2005 - 09:51 am:   

What is the status of the lights on north Teel, south of the bridge? They were on for a day or so, but have not been on since. The lights north of the bridge are working fine.
 

Brian C
New member
Username: Brianc

Post Number: 42
Registered: 06-2003
Posted on Friday, June 17, 2005 - 03:52 pm:   

What about the lights on Ohio?

What other lights are street lights are pending install this year?
 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 32
Registered: 10-2003
Posted on Monday, June 20, 2005 - 03:18 pm:   

Tim,

I was told the street lights on Teel from Main to the bridge were turned back on prior to last weekend. If this is not the case, please let me know.

Thanks, Hulon
 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 33
Registered: 10-2003
Posted on Monday, June 20, 2005 - 04:12 pm:   

Brian C,

The contractor is waiting on Coserv Electric to set the transformers to get power to the street lights on Ohio. I anticipate Coserv to complete this installation sometime next month after which the meter can be installed and the wiring completed prior to turning the lights on.

As for the other street lights pending this year, nothing has changed from my February 9, 2005 response to you under a separate thread. The design contract for the street lights on the five roadways referred to by the City Manager in his February 11, 2005 post to you is proposed to go to council next month for consideration. Once approved, desgin will begin and detailed costs prepared for consideration of funding.

If you need any additional information, please feel free to contact me at (972) 335-5585 ext. 127.

Thanks, Hulon
 

matt c.
New member
Username: Mc2000

Post Number: 3
Registered: 10-2004
Posted on Thursday, June 30, 2005 - 04:06 pm:   

During construction of the Main/Teel and Main/Legacy intersections, was there any consideration made for 18-wheel, tractor-trailers that make right-hand turns that result in huge ruts on virtually every corner? It seems as though, since these are 4-lane sections, there isn't enough room for the trailers to clear the curb. Can this be corrected?
 

Fairwayman
New member
Username: Fairwayman

Post Number: 15
Registered: 11-2003
Posted on Thursday, October 13, 2005 - 10:26 am:   

What is the status of the Teel bridge road project? In January you posted that "Funding for this bridge is on the list of priority road projects that staff will be presenting to City Council within the next 2 weeks. Given Wes' timeline, this bridge should be completed near the beginning of 2006." There appears no way that this timeline is even close to accurate any more as we are already nearing "the beginning of 2006".
 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 57
Registered: 10-2003
Posted on Friday, October 14, 2005 - 08:29 am:   

Fairwayman thanks for the post. The design of the Teel bridge project took longer than originally anticipated but has been bid and was awarded by City Council to North Texas Bridge Company. Contracts have been sent to the contractor and are expected to be returned next week. We anticipate construction to begin next month and be complete in July 2006.

If you need any additional information, please feel free to contact me at (972) 335-5585 ext. 127.

Thanks, Hulon
 

Mark
New member
Username: Mark

Post Number: 1
Registered: 11-2005
Posted on Thursday, November 10, 2005 - 02:37 pm:   

I understand that, eventually, Teel will be a 6 lane road. Can you tell me where the land for the extra two lanes will come from? My house backs up to Teel and there is not a lot of space between my fence and Teel now. Will the extra lanes be added by removing the current sidewalks or will it come from removing part of the median?
 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 62
Registered: 10-2003
Posted on Friday, November 11, 2005 - 04:05 pm:   

Good question Mark. Typically, as in the case with Teel Parkway, the extra two lanes to widen the roadway from 4 lanes to 6 lanes will come from the median.

If you need any additional information, please feel free to contact me at (972) 335-5585 ext. 127.

Thanks, Hulon
 

Fairwayman
New member
Username: Fairwayman

Post Number: 16
Registered: 11-2003
Posted on Tuesday, November 29, 2005 - 01:35 pm:   

Teel south of Main looks like it is going to open soon. Is there a date? Will there be a stop light installed at Teel and Lebanon?
 

Hulon Webb, Engineer
Moderator
Username: Hulon

Post Number: 66
Registered: 10-2003
Posted on Wednesday, November 30, 2005 - 03:43 pm:   

Thanks Fairwayman for the post. Teel Parkway south of Main Street is nearing completion and is expected to be open to traffic in two weeks. The traffic signal at Teel and Lebanon is under design and is anticipated to be constructed and operational early March 2006.

If you need any additional information, please feel free to contact me at (972) 335-5585 ext. 127.

Thanks, Hulon
 

John
New member
Username: Caloixc

Post Number: 3
Registered: 06-2005
Posted on Wednesday, November 30, 2005 - 10:50 pm:   

With no stoplight there, are there any estimates as to how many people will go through there with their commute? I go through the Teel/Lebanon intersecion every day and sometimes have no cars to wait for. Should those of us who take that expect to add an additional 5 or 10 min to our drive? Is it possible to speed up the signal process, or put in a 4-way stop? This looks like it will be a nightmare if Lebanon traffic does not have to stop. Thanks!

Add Your Message Here
Post:
Username: Posting Information:
This is a private posting area. Only registered users and moderators may post messages here.
Password:
Options: Post as "Anonymous"
Enable HTML code in message
Automatically activate URLs in message
Action: