Posted on Saturday, July 26, 2014 - 04:57 pm:   

Are there plans to replace the playground shades for Fairway Green Park that were damaged in the ice storm last year?
 

Ben Brezina, Assistant to the City Manag
Moderator
Username: Ben_brezina

Post Number: 697
Registered: 06-2010
Posted on Tuesday, August 05, 2014 - 10:56 am:   

We are working through that right now. We have had quite a few problems with these shade sails over the years. We are asking multiple suppliers to review the design and engineering that is in place, to determine if a better solution is available. We currently have 2 quotes and options to choose from and are awaiting a third. As soon as we find the best solution we will move forward with purchasing them and having them installed.

I apologize for the delay.
 

Ben Brezina, Assistant to the City Manag
Moderator
Username: Ben_brezina

Post Number: 698
Registered: 06-2010
Posted on Tuesday, August 05, 2014 - 10:59 am:   

We are working through that right now. We have had quite a few problems with these shade sails over the years. We are asking multiple suppliers to review the design and engineering that is in place, to determine if a better solution is available. We currently have 2 quotes and options to choose from and are awaiting a third. As soon as we find the best solution we will move forward with purchasing them and having them installed.

I apologize for the delay.
 

S JENSEN
New member
Username: Veriis

Post Number: 2
Registered: 01-2010
Posted on Tuesday, May 19, 2015 - 12:52 pm:   

Are there any updates on adding those shade sails to the park? With summer approaching curious if the park will be shaded this year.
 

Ben Brezina, Assistant to the City Manag
Moderator
Username: Ben_brezina

Post Number: 795
Registered: 06-2010
Posted on Wednesday, June 17, 2015 - 12:52 pm:   

The Parks and Recreation Staff went through an analysis of the existing structure with multiple shade sail vendors to identify why the previous sails continue to fail within a couple years of installation. Through this process the existing structure was deemed unacceptable to have any new sails attached due to itís the current condition. Staff has been working with a vendor who developed a concept that will work for this playground, and this concept and budget were approved by the Parks and Recreation Board in May. The Board voted to proceed forward with the design and installation of a new structure for the playground. Currently, Staff is working with the vendor to finalize the contract so they can begin developing the structural drawings and begin fabrication of the structure. Staff and the vendor are diligently working to ensure this structure is installed over the playground as soon as possible.

Add Your Message Here
Post:
Username: Posting Information:
This is a private posting area. Only registered users and moderators may post messages here.
Password:
Options: Enable HTML code in message
Automatically activate URLs in message
Action: